Sao Paulo motorway part crashes on subway tunnel built by Acciona

Part of one of the main highways in Sao Paulo, there was a storm on March over a construction project in which the Spanish company Acciona SA is excavating a tunnel for a new metro line, although no reports have been made.

Television pictures show a carriage of the Marginal Tiete motorist carrying a large bouquet that is in the construction of a tunnel to the 6th floor line of the metro next to a river.

The state operator of Sao Paulo Metro dijo in his web site that the tunnels excavated for the new metro project are inundated.

The public safety authorities say that they 50 workers working in the tunnel hall and only the tuvieron who are waiting for the contact with the water sucia that broke in the work.

“We do not know if a water tuber was fired at the excavation or if it was the river of the river Tiete”, said the captain of the body of bomber Andre Elias in a statement.

The governor of Sao Paulo, Joao Doria, said on Twitter that he was not victimized and that he told the Spanish engineering group to work with the municipal authorities to recreate the traffic on the motorway and renew the work on the possible underground lines .



Action is managing the construction of the new line 6 of the metro in a public-private consortium with the state of Sao Paulo. The project is expected to be operational by 2025.

The actions of the Spanish construction company and renewable energy borraban sus ganancias del día y perdían circa de 2% tras el colapso.

The 15-kilometer line, one of the major infrastructure projects underway in Latin America, unites the district of Brazil, north of Sao Paulo, with the city center.

Acciona the contract, valued at $ 2,590 million, was approved to roll out and exploit Sao Paulo Line 6 in October 2020.

The company said in a statement that Tomo had all the contingent media required during the crash.



Reference-www.eleconomista.com.mx

Leave a Comment